The objective of the Hunan Urban Development Project for China is to foster greater integration in the Changsha-Zhuzhou-Xiangtan (CZT) region of Hunan province through support for a carefully selected set of priority investments to address specific regional needs in a sustainable manner. The main changes are: (i) deletion of project components that are no longer relevant; (ii) reallocation of loan savings from deleted components; (iii) adjustment of disbursement percentages; (iv) extension of closing date; and (v) revision of monitoring indicators and results framework to reflect the restructured components. The procurement plan and implementation schedule have also been revised to accommodate the changes.
Detalhes
-
Data do documento
2010/05/18
-
TIpo de documento
Documento do projeto
-
No. do relatório
54554
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/05/25
-
Disclosure Status
Disclosed
-
Nome do documento
China - Hunan Urban Development Project : restructuring
-
Palavras-chave
institutional strengthening;Risks and Mitigation Measures;economic and financial analysis;Land Acquisition and Resettlement;extension of closing date;reallocation of proceeds;front end fee;counterpart fund;counterpart funding;civil works;construction of dykes;construction of sewer;length of road;increase in land;interest during construction;increase in capacity;urban development investment;results framework;municipal government;loan proceeds;clean coal;resettlement cost;coal washing;domestic train;municipal budget;contract management;road contracts;amount due;regular supervision;cumulative target;drainage company;sewage treatment;managerial capacity;procurement contract;climatic factor;wet season;cold weather;restructuring plan;baseline indicator;long-term training;disbursement ratio;outcome targets;front-end fee;construction supervision;water protection;impact monitoring;construction activities;government plan;regional needs;input data;tour groups;overseas study;Proposed Investment;project costing;provincial development;effluent quality;catchment area;wastewater treatment;flood protection;pumping station;safeguard policy;Safeguard Policies;affected population;historic site;monitoring indicator;coal company;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.