Skip to Main Navigation

Ethiopia - Accelerated Electricity Access (Rural) Expansion Project (Inglês)

Detalhes

  • Data do documento

    2006/02/17

  • TIpo de documento

    Documento de informações do projeto

  • No. do relatório

    AB2144

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Etiópia,

  • Região

    África,

  • Data de divulgação

    2006/04/05

  • Disclosure Status

    Disclosed

  • Nome do documento

    Ethiopia - Accelerated Electricity Access (Rural) Expansion Project

  • Palavras-chave

    rural town;rural area;Poverty Reduction & Economic Management;Access to Electricity;Energy Sector;economic and financial analysis;Financial Management System;incremental investment in generation;average income per capita;fair distribution of benefits;long run marginal cost;access to infrastructure service;electrification program;power system;expansion of access;forms of energy;rural electrification program;capacity expansion program;tariff structure;criteria for selection;compact fluorescent lamp;demand for electricity;private sector activity;proportion of biomass;human development outcome;natural resource degradation;supply of electricity;sector capacity building;public sector reform;increase tariff;public sector investment;investments in power;cost of electricity;increase in consumption;lack of skill;rural electricity supply;average tariff increase;gross primary enrollment;consumption of oil;delivery of service;barrier to entry;power sector expansion;number of connections;public sector consumption;lack of capital;rural population;installed capacity;electricity access;debt restructuring;financial sustainability;connection rate;electricity subsidies;subsequent years;investment program;energy access;managerial capacity;wood fuel;safeguard policy;improving governance;Safeguard Policies;Financial Sector;power utilities;consumption habit;supply-side measure;improve forest;interfuel substitution;environmental degradation;water heating;financing source;hydrological potential;public street;electrification effort;financial reporting;interconnected grid;donor funding;cost breakdown;retroactive financing;donor meeting;political environment;financial statement;trained manpower;auditing system;modern fuel;political events;logistical support;subsequent phase;financial situation;effective subsidy;power utility;market study;Market Studies;affordable rate;financial intervention;financial pressure;electricity sector;industrial growth;institutional aspect;transmission line;distribution network;budgetary cost;hydro generation;generation potential;construction phase;demand growth;electric system;hydro plant;hydrologic conditions;private investor;limited capacity;electric sector;capital consumption;institutional strengthening;expansion plan;living standard;management capability;financial feasibility;poor household;tariff rate;large corporation;infrastructure necessary;private consumption;quality improvement;increase poverty;civil society;Macroeconomic Stability;abundant resource;populous country;community empowerment;Rural Growth;equity contribution;market size;investment climate;extensive consultation;private investment;capacity cost;average cost;water pump;flour mill;operational efficiency;Power Generation;export market;investment environment;household use;resource constraint;involuntary resettlement;important component;infrastructure needs;rural base;electricity coverage;indigenous people;hydro resources;public consultation;promoting growth;financial concern;private operator;financial health;grid extension;commercial loss;scarce resource;macro economic;real benefits;natural habitat;cultural property;investment cost;Indigenous Peoples;Financing plans;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.