International Development Association (IDA) provided its first Partial Risk Guarantee (PRG) for Vietnam in support of the second phase of the Phu My Power Project. This is the first private infrastructure build-operate-turnover (BOT) project launched under an internationally competitive bid in Vietnam, and it is expected to set the framework for future private sector infrastructure developments in the country.
Detalhes
-
Data do documento
2003/01/01
-
TIpo de documento
Informativo
-
No. do relatório
53454
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/07/01
-
Disclosure Status
Disclosed
-
Nome do documento
IDA guarantee supports first competitively-bid private power project in Vietnam
-
Palavras-chave
power purchase agreement;provincial water supply;long run marginal cost;operations and maintenance;average capacity;commercial bank debt;power generation capacity;political risk insurance;quantity of gas;domestic gas supply;private capital flow;payment of principal;dispute resolution process;debt service payment;supply of gas;categories of risk;event of default;debt equity ratio;Guaranteed loans;power station;payment obligation;original debt;load shedding;dry season;project financing;hydropower plant;government default;competitive generation;competitive bid;project agreements;contractual party;guarantee fee;fuel cost;Counter Guarantee;gas phase;equipment supplier;commercial license;infrastructure sector;long-term debt;installed capacity;successful financial;currency convertibility;foreign exchange;currency conversion;commercial lender;commercial operation;private finance;gas-fired power;financing requirement;retail tariff;transmission system;private developer;direct loan;contractual arrangement;private parties;private party;project costing;commercial company;contingent financing;private power;gas field;government guarantee;construction period;banking corporation;government issue;commercial debt;international bidder;financing package;exclusive right;risk coverage;financial closure;fixed rate;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.