Skip to Main Navigation

China - Shanghai Urban Environment Project : environmental assessment (Vol. 9) : Environmental management plan of the Minfeng Raw Water Conveyors Project (Chinês)

The Shanghai Urban Environment Project for China is intended to provide a sustainable environmental setting for the long term economic and social development in the Municipality of Shanghai while supporting the provision of urban infrastructure. The project environmental negative impacts follow: soil, waste water, pollution, air quality noise, dust, and traffic. Mitigation measures include: (i) covering temporary soil stock piles; (ii) minimizing active excavation area during pipe trenches; and (iii) installation of sediment fences where appropriate to minimize sediment runoff. Disturbed surfaces, such as re-compacted pipelines trenches, will be re-vegetated to minimize erosion. Soil contamination may be cased by inappropriate storage and disposal of hazardous construction materials. Especially for wastewater component Bailonggang Southern Collector Extension Project will spread across 17 local rivers, of which the Pudong Channel and Cuanyang River have a navigation function, other rivers perform a flood protection function. During project construction, advanced technology - pipe jacking technology will be used, with no impact to the rivers function. Water will be sprayed transportation routes and material handing sites where dust is being generated. Particular attention will be paid to dust suppression adjacent to sensitive receptors such as schools or residential areas. Material will be stored in appropriate places and covered sprayed to minimize dust. Material will be covered during transportation to avoid spillage or dust generation. Air pollution may be caused by emissions from vehicles and construction machinery. Vehicles and construction machinery will be properly maintained and will comply with emission standards. Construction materials and waste will be stored in secure, covered areas with secondary containment. All waste will be removed from sites to approved waste disposal sites. There will be no on-site landfills at any of the construction sites. Construction waste will be promptly removed from the sites, and the burning of waste will be prohibited.

Detalhes

  • Data do documento

    2014/08/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E1959

  • Nº do volume

    9

  • Total Volume(s)

    12 (Ver todos os volumes)

  • País

    China,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2015/03/23

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental management plan of the Minfeng Raw Water Conveyors Project

  • Palavras-chave

    construction period;construction site;grievance redress mechanism;water;water source;environmental protection measures;environmental monitoring;construction and operation;wastewater collection and treatment;fund for environmental protection;conservation area;water intake;oil spill accident;surface water monitoring;environmental protection department;raw water;environmental monitoring data;water pumping station;raw water source;local environmental quality;raw water supply;environmental protection requirements;maintenance and repair;channels of communication;water supply capacity;drinking water source;noise control standards;environmental protection management;adverse environmental impact;environmental quality targets;emergency response plan;environmental impact mitigation;society and environment;use of wastewater;implementation of mitigation;implementation of law;environmental quality monitoring;potable water treatment;wastewater treatment system;host country regulation;physical cultural resources;source of pollution;surface water quality;water quality monitoring;wastewater treatment facility;project construction;construction company;environmental supervision;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.