Detalhes
-
Autor
-
Data do documento
2014/11/08
-
TIpo de documento
Documento de informações do projeto
-
No. do relatório
PIDA13382
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Nome do documento
Project Information Document (Appraisal Stage) - Kariba Dam Rehabilitation Project - P146515
-
Palavras-chave
energy security;cubic meters per second;installed capacity;power station;dam;safeguard policy;Safeguard Policies;dam foundations;generation capacity;national utility;flood control;Water Resource Management;national power utility;natural disaster management;loss of water;regional power system;natural resource base;concrete arch dam;demand for power;safety and reliability;Hydropower;reservoir;regional infrastructure;long-term growth;heavily dependent;energy development;power production;operational level;water level;dam safety;emergency spillway;international standard;public consultation;institutional context;investment need;dam wall;reserve requirement;peak demand;energy mix;winter season;large reservoir;reservoir capacity;tourism operations;subsistence fisheries;regional growth;Energy Sector;electricity sector;hydropower scheme;flood protection;individual activity;flood season;flood attenuation;supply water;discharge capacity;safe operation;concessional loan;hydropower station;long-term safety;Blackout;
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.