Skip to Main Navigation

Cameroon - CM-Energy Sector Development SIL (FY08) (Inglês)

Detalhes

  • Autor

    IEG Review Team

  • Data do documento

    2018/05/10

  • TIpo de documento

    Revisão do Relatório de Conclusão da Implementação

  • No. do relatório

    ICRR0021059

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Camarões,

  • Região

    África,

  • Data de divulgação

    2018/05/10

  • Disclosure Status

    Disclosed

  • Nome do documento

    Cameroon - CM-Energy Sector Development SIL (FY08)

  • Palavras-chave

    increase access to modern energy; Environmental and Social Management Framework; Economic Internal Rate of Return; preparation of bidding documents; rural electrification master plan; rural electrification scheme; availability of electricity; Access to Electricity; Standard Bidding Documents; rural energy fund; private sector entrepreneur; return on investment; competitive bidding process; long term development; social and environmental; lack of accountability; public sector financing; transmission and distribution; number of connections; basis for tariff; allocation of fund; private sector engagement; effectiveness of investments; achievement of outcome; private sector investor; energy sector institutions; rural electrification effort; poverty reduction goal; electricity distribution network; Resettlement Policy Framework; access to radio; private sector operator; bank's procurement guidelines; delay in procurement; sustainability of development; grid extension; rural area; Energy Projects; procurement capacity; results framework; government's growth; outcome targets; electricity grid; safeguard policy; Safeguard Policies; project indicator; mini-grid system; operational efficiency; increased access; project costing; household connection; adequate regulatory; private investment; transmission line; procurement delay; investment program; electricity law; connection cost; borrower performance; project finance; secondary legislation; financial rate; legislative framework; electricity connection; procurement activities; regular meetings; tariff structure; regulatory function; land holder; regulatory environment; private investor; financial statement; mitigation measure; involuntary resettlement; generally well; sea change; ensuring compliance; natural habitat; Environmental Assessment; auditors opinion; staff resource; financial resource; insufficient information; project's progress; indoor pollution; environmental study; regulatory model; result indicator; energy access; financing plan; Financing plans; electricity sector; subsequent years; economic efficiency; discount rate; grid connection; energy generation; water flow; hydroelectric plant; hydropower capacity; eradicating poverty; industrial enterprise; energy infrastructure; Advisory services; causal chain; investment subsidies; loan contract; energy expansion; consumer protection; regulatory governance; basin management; institutional framework; technical expert; social study; social studies; contract agreement; dam safety; future hydropower; donor financing; reform process; subsequent phase; investment cost; energy provider; banking sector; private operator; detailed planning; consulting engineer; private electricity; distribution asset; investment scheme; business model; intermediate outcome; financial efficiency; financial sustainability; learning experience; food conservation; project financing; donor support; safeguards compliance; project's achievements; average cost

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.