Detalhes
-
Autor
Xiaoming Li
-
Data do documento
2020/12/26
-
TIpo de documento
Plano de Aquisições
-
No. do relatório
STEP43070
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/12/26
-
Disclosure Status
Disclosed
-
Nome do documento
China - EAST ASIA AND PACIFIC- P148294- Wuhan Integrated Transport Development - Procurement Plan
-
Palavras-chave
post qualification; intelligent transportation system; water supply and drainage; intelligent traffic management; market approach; contract completion; cycle traffic; Revised Plan Date; bus terminal; railway station; transfer hub; road safety; civil works; civil engineering; credit contract; transport development; traffic engineering; bus route; bus system; electric bus; Consulting services; Exchange Rates; rail station; inspection service; traffic barrier; high sea; technical proposal; Parking Lot; procurement process; domestic competitive; cost control; transportation infrastructure; management engineering; bus procurement; transfer facility
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.