Skip to Main Navigation

Uzbekistan - Syrdarya Water Supply Project (Inglês)

Detalhes

  • Data do documento

    2010/03/17

  • TIpo de documento

    Folhas de Dados Integradas sobre Salvaguardas

  • No. do relatório

    AC5222

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Uzbequistão,

  • Região

    Europa e Ásia Central,

  • Data de divulgação

    2010/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Uzbekistan - Syrdarya Water Supply Project

  • Palavras-chave

    Institutional Strengthening and Capacity Building;number of people with access;delivery of water supply service;operations and maintenance;quality of water supply;Environmental and Social Safeguard;access to urban service;access to basic service;provision of water supply;source of drinking water;expansion of water supply;Environmental and Social Monitor;water supply system;water supply infrastructure;water supply network;public awareness campaign;safeguard policy;Safeguard Policies;financial working ratio;access to asset;rights of way;number of water;construction and operation;water supply distribution;procurement of equipment;pollution of soil;public water supply;grievance redress mechanism;access to land;replacement of valve;consumption of water;rehabilitation of water;water supply operation;improved water supply;water intake facility;scarcity of water;physical cultural resources;water supply pipe;response to crisis;loss of income;extreme climate events;negative environmental impact;risk to health;water distribution system;safety of dam;bank supervision missions;international waterway;pumping water;involuntary resettlement;land acquisition;water meter;resettlement plan;civil works;water tower;pumping station;local groundwater;investment planning;social aspect;transmission main;underground water;national legislation;accidental release;urgent rehabilitation;deep well;water source;system failure;positive impact;project plan;groundwater source;pipe breaks;project intervention;health condition;institutional assessment;operational reserve;consumer satisfaction;additional water;beneficiary assessment;water conservation;sewerage investment;soil pollution;investment loan;waste water;social impact;public place;local ngo;institutional responsibilities;project costing;environmental specialist;routine monitoring;supply lines;utility management;connection rate;household wastewater;public consultation;water logging;domestic water;public meeting;bank for review;construction practices;surface water;water table;natural disaster;electrical network;indigenous people;accidental spillage;chemical use;safeguard issue;Bank Policies;result indicator;safety hazard;worker safety;irreversible impacts;construction phase;Indigenous Peoples;rural area;Sanitation Services;agricultural activity;safeguard analysis;knowledge exchange;sustainable operation;measurable outputs;service contract;improper disposal;central laboratory;construction standard;organizational arrangement;physical characteristic;mitigation measure;vegetable garden;natural habitat;infrastructure work;phone network;artesian wells;residential building;communication strategy;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.