The assessment of outcome is satisfactory, sustainability likely, and the institutional development impact is high. The following lessons were drawn from the project. A thorough geological survey for future operations is suggested to be conducted, given the lower reservoir instability, and excessive local ground settlement in the upper reservoir, occurrences unforeseen which delayed work progress. In addition, the selection of suppliers, should be carefully planned, followed by a rigorous quality control to avoid potential failures in high voltage transformers; such assessment should be followed by subsequent shop inspections during construction, and installation. Nonetheless, the appropriately defined terms of reference for consultants, particularly short-term consultants, proved successful, which paved the way for highly relevant services.
Detalhes
-
Data do documento
2002/12/23
-
TIpo de documento
Conclusão da Implementação e Relatórios sobre Resultados
-
No. do relatório
25237
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
China - Tianhuangping Hydroelectric Project
-
Palavras-chave
Hydroelectric power plants; Geological surveys; Reservoirs; Ground catchment; Project implementation; Consultant contracts; Equipment supply contracts; Quality control; Project design; Monitoring criteria; Implementing agencies; Project restructuring
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.