Venezuela - Maiquetia International Airport Project (Inglês)

The construction at Maiquetia International Airport would include: (a) a new paved runway 3,500 m by 45 m with parallel and connecting taxiways, (b) control tower, (c) runway and taxiway lighting and navigation aids, and (d) other related works. It also includes consultants' services for the detailed design of the terminal complex and for strengthening the management and accounting of the Airport Authority. The project constitutes the first part of the Maiquetia International Airport Development Plan. The second part will cover the construction of the terminal complex.

Detalhes

  • Data do documento

    1972/01/31

  • TIpo de documento

    Relatório sobre Avaliação do Pessoal

  • No. do relatório

    PTR99

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Venezuela, República Bolivariana da

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2010/06/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    Venezuela - Maiquetia International Airport Project

  • Palavras-chave

    instrument landing system;foreign exchange;capital investment program;higher rate of inflation;international trade in good;air transport system;terminal building;safety standard;domestic passenger;passenger terminal building;very high frequency;land use planning;international air service;international airport;national development plan;cost accounting principles;public transport operation;civil aviation agency;commercial accounting system;cost accounting system;growth of tourism;elasticity of demand;upper income group;investments in infrastructure;air traffic projection;safety of aircraft;rapid transit system;expropriation of land;aircraft maintenance operation;airport expansion program;national tourism;concentration of population;internationally accepted standards;planning and design;principal trading partners;aircraft parking apron;Planning and Financial;rate of growth;terms of trade;growth of traffic;number of aircraft;source of income;source income;international air transport;expansion of export;volume of traffic;reduction in traffic;international air cargo;gdp growth rate;passenger time cost;jet aircraft;international passenger;foreign visitors;aircraft operation;air carrier;passenger traffic;domestic traffic;financial responsibility;financial projection;air route;financial analyst;site preparation;petroleum industry;freight terminal;industrial employment;autonomous agency;appraisal mission;future traffic;financial evaluation;airport authority;transition period;construction work;construction cost;management consultant;airport service;business travel;income statement;property development;control tower;engineering study;traffic condition;autonomous institute;terminal area;commercial aviation;population center;accident rate;engineering design;foreign expenditure;financial autonomy;international aviation;passenger travel;financial discipline;industrial exports;diversion works;organizational structure;finance objective;aviation industry;debt service;accident prevention;financial requirement;direct beneficiaries;safety improvement;aircraft accident;airport system;fatality rate;adverse consequence;long range;foreign component;adequate compensation;commercial areas;fatal accident;Zoning Ordinance;taxiway construction;construction funds;airport design;navigation aid;international airline;project execution;land cost;project costing;currency cost;domestic operations;rough terrain;tourist industry;capital expenditure;financial status;existing asset;financial result;unspoiled beaches;accrual basis;profit center;price decision;financial policies;financial information;toll highway;landing aid;response time;aircraft speed;aircraft size;headquarters unit;Cash flow;safety hazard;excess cash;international travel;export earning;export earnings;consultancy service;coastal area;passenger movement;air passenger;domestic route;passenger survey;restricted use;cruise passengers;commodity export;capital good;petroleum sector;favorable assumptions;manufacturing sector;climatic condition;public credit;Air Safety;small states;intermodal transport;foreign airline;domestic airline;loan application;traffic statistic;inclement weather;paved road;economic expansion;inland waterway;central regions;water transport;retail price;internal movement;construction period;imported materials;procurement contract;local contractor;loan fund;railway line;grace period;navigational aid;financing plan;Financing plans;civil works;railway system;adequate capacity;navigable river;iron ore;bulk carrier;airport site;oil tanker;coastal shipping;ground traffic;industrial demand;international operation;passenger volume;marketing effort;international carrier;air freight;public accountant;direct flight;passenger operation;aircraft movement;technical feasibility;traffic growth;aviation activity;demand model;taxiway system;cement concrete;asphaltic concrete;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.