Skip to Main Navigation

Ethiopia - Second Urban Water Supply and Sanitation Project : restructuring : Disclosable Restructuring Paper - Second Ethiopia Urban Water Supply and Sanitation Project - P156433 (Inglês)

The objective of the Second Ethiopia Urban Water Supply and Sanitation Project for Ethiopia is to increase access to enhanced water supply and sanitation services in an operationally efficient manner in Addis Ababa and selected Secondary Cities. The first Urban Water Supply and Sanitation Project (UWSSP) was approved on April 24, 2007 as an investment project with a total financing of SDR 67.2 million from an IDA grant and Credit. With a slight change to the objective of the original project, the World Bank approved an Additional Financing (AF) of SDR 96.90 million on May 31, 2012. The revised closing date for the UWSSP is December 31, 2017 and all project activities have been completed, except for the completion, testing and commissioning of the Addis Ababa Kality sewerage system expansion and the Dire Dawa water supply system expansion sub-projects. Specifically, the remaining activities for Addis Ababa Kality subproject consist of extension of Kality trunk sewer line for the remainder of about 4 Kms, provision of sewer connections to households, and completion of Kality wastewater treatment plant (5 percent) including commissioning, testing and handing over the plant to the client. The remaining activities for the Dire Dawa subproject consist of completion of electromechanical equipment and pipes supply and installation works; extension of the primary and secondary distribution network into unserved areas, and provision of tertiary distribution, and residential connections. At project closing, the UWSSP will be 10.8 years old. Recognizing the implications of further extending the project closing date on the overall country portfolio performance, the Government of Ethiopia (GOE)officially requested to close the project without further extension and to transfer the incomplete activities from the two sub-projects to the UWSSP-II. The project objective and activities under the UWSSP-II are like the UWSSP. In addition, both Addis Ababa and Dire Dawa cities are among the 23 beneficiary cities covered by the UWSSP-II.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.