Skip to Main Navigation

Uruguay - Third Highway Project (Inglês)

Detalhes

  • Data do documento

    1994/06/30

  • TIpo de documento

    Relatório de Conclusão do Projeto.

  • No. do relatório

    13295

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Uruguai,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2010/06/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    Uruguay - Third Highway Project

  • Palavras-chave

    project costing;quality of bank supervision;road subsector;Operational Core Curriculum;quality of bank portfolio;ex post evaluation;vehicle operating cost;call for bids;primarily due;cost of transport;road and bridges;lack of staff;front end fee;transfer of fund;reduction in transfer;national currency devaluation;national transport system;weights and measure;reductions in cost;road construction industry;national transport plan;adverse environmental effect;Technical Assistance Fund;national highway network;cost accounting system;national road network;reconstruction and rehabilitation;civil works;sector priorities;road sector;macro economic;Traffic Safety;annual investment;cost data;budget allocation;staff turnover;road maintenance;consulting service;intermodal transport;Consulting services;borrower's performance;exchange rate;Road Networks;Exchange Rates;financing plan;Financing plans;statistical information;budget restriction;river transport;transport planning;sectoral planning;uruguayan peso;government transfer;Commitment Fee;institutional strengthening;dollar term;road safety;competitive bid;construction expenditures;short term consultant;investment requirement;bridge rehabilitation;net result;loan disbursement;government fund;environmental change;land owner;primary reason;traffic count;road section;road corridor;transit traffic;highway maintenance;inadequate maintenance;restructuring program;poor infrastructure;high transport;local costs;municipal administration;consumer price;foreign exchange;financial framework;smaller port;inadequate fund;national network;port facility;rural transportation infrastructure;payment lag;population center;commercial airport;petroleum import;international connections;railway track;Technology Transfer;reconstruction work;geographical spread;certified copies;physical work;loan supervision;contract management;physical achievement;safety hazard;main transport;competitive bidding;certified copy;long-term benefits;monetary policy;investment program;railway system;transport investment;fiscal resource;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.