Skip to Main Navigation

Cameroon - Railway Concession Project (Inglês)

Detalhes

  • Data do documento

    2010/03/16

  • TIpo de documento

    Revisão do Relatório de Conclusão da Implementação

  • No. do relatório

    ICRR13346

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Camarões,

  • Região

    África,

  • Data de divulgação

    2016/09/23

  • Disclosure Status

    Disclosed

  • Nome do documento

    Cameroon - Railway Concession Project

  • Palavras-chave

    environment and natural resources management;access to potable water;Occupational health and safety;Institutional Development and Capacity;French Agency for Development;social improvement;quality of supervision;debt coverage ratio;track maintenance;reallocation of fund;construction and rehabilitation;Solid Waste Management;transport of fuel;cost benefit analysis;construction of wells;state owned railway;private sector operation;social development specialists;financial sustainability;railway concession;private operation;railway sector;railway service;concession design;investment program;project costing;environmental cleanup;Forests Safeguards;public finance;infrastructure rehabilitation;groundwater contamination;food sale;concession term;private institution;public announcement;social issue;social impact;emergency preparedness;public consultation;response plan;railroad safety;train station;passenger station;infrastructure service;environmental hygiene;monitoring indicator;staff retrenchment;data availability;measurable indicators;passenger rail;insufficient information;medical center;employee health;social condition;illegal logging;quality rating;bank restructuring;water drilling;external review;operational performance;direct lender;financial requirement;medical examination;Government Performance;financial difficulties;Cash flow;fixed installation;short-term liability;short term liabilities;short-term asset;concession framework;liquidity ratio;increasing competitiveness;rail sector;passenger fare;transport company;staff increase;rail concession;outcome indicator;contract design;rail infrastructure;outcome targets;staff productivity;productivity ratio;fiscal impact;net transfer;concession program;freight car;financial projection;adequate guarantees;local capacity;resettlement compensation;transport operation;workshop facility;environmental pollution;fire prevention;state divestiture;engineering study;passenger coach;pedestrian bridge;Management Systems;railway operation;fund activity;railway network;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.