The development objective of the First Phase of the Dasu Hydropower Project for Pakistan is to facilitate the expansion of electricity supply of hydro-power in Pakistan. Some of the negative impacts and mitigation measures include: (1) Pakistani rupee (PKR) 1,120,000 for each tower as compensation for the land taken for each tower. The amount may vary from on one tower to another due to location and a variety of other factors; (2) cash compensation at replacement rates for affected structure and other fixed assets free of salvageable materials, depreciation, and transaction costs; (3) crop compensation in cash at full market rate for one year (winter and summer seasons) for impacts caused by grid construction, tower base, stringing, and access roads; (4) for timber and wood trees, the compensation will be at market value of tree’s wood content; (5) in case of temporary loss, cash compensation equal to the period of the interruption of business up to a maximum of six months or covering the period of income loss based on construction activity; (6) community support program such as roads, clinic, market etc. to be built in consultation with the affected people during implementation; and (7) temporary or permanent employment during construction or operation, wherever feasible.
Document also available in :
Detalhes
-
Autor
Pakistan
-
Data do documento
2019/11/01
-
TIpo de documento
Plano de reassentamento
-
No. do relatório
SFG5872
-
Nº do volume
3
-
Total Volume(s)
4
-
País
-
Região
-
Data de divulgação
2019/11/21
-
Disclosure Status
Disclosed
-
Nome do documento
مانسہرہ گرڈ اسٹیشن کے لئے دوبارہ آبادکاری ایکشن پلان: مختصر خلاصہ
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.