The project consists of three components: (i) provision of $25 million to meet part of IDBI's requirements for financing of the import component of specific industrial projects aimed at producing for export or located in less-developed regions; (ii) provision of $5 million to help finance imported equipment, materials and consultants' services estimated at 25 man-months required for: (a) strengthening the Government's capacity to appraise and supervise industrial R&D projects; (b) establishment of a basic R&D facility for the Negev R&D Authority; and (c) five R&D subprojects to develop a prototype non-convecting pond to collect and store solar energy; commercial cultivation of the jojoba bean and a family of commercial waxes derived from it; a telephone system for communities of between 100 and 400 subscribers; a family of engines compatible with a variety of energy sources; and a high-performance tomographic scanner; (iii) provision of $5 million to help finance expansion of: (a) three technician/practical engineering institutes; and (b) four vocational training centers.
Detalhes
-
Data do documento
1975/05/31
-
TIpo de documento
Memorando e recomendação do Presidente
-
No. do relatório
P1626
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/24
-
Disclosure Status
Disclosed
-
Nome do documento
Israel - Industrial Development Project
-
Palavras-chave
Engineering education; Engines; Financial institutions; Industrial research; Industry; Laboratories; Projects; Solar energy; Technical education; Technical schools; Telephone services; Vocational training
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.