Central Asia - Hydrometeorology Modernization Project : additional financing (Inglês)

Detalhes

  • Autor

    Kull,Daniel Werner

  • Data do documento

    2018/01/18

  • TIpo de documento

    Project Information and Integrated Safeguards Data Sheet

  • No. do relatório

    PIDISDSA23165

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Ásia Central,

  • Região

    Europa e Ásia Central,

  • Data de divulgação

    2018/01/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    Central Asia - Hydrometeorology Modernization Project : additional financing

  • Palavras-chave

    Safeguard Policies;safeguard policy;early warning;hydrometeorological service;health and safety risk;Occupational health and safety;civil works;hydromet services;disaster risk management;severe weather events;minor repair work;financing instrument;extreme weather event;regional infrastructure development;regional public goods;quantity of water;Disaster Risk Reduction;climate change projections;Water Resource Management;exchange rate fluctuation;climate change adaptation;institutional context;natural hazard;mountainous area;climate information;disaster losses;agriculture accounting;total employment;monitoring equipment;Energy Sector;concrete work;renovation work;river bed;physical characteristic;safeguard analysis;participating country;regional operation;strategic objective;meteorological stations;agricultural production;disaster impacts;project costing;eligibility requirement;financial resource;legal authority;grant funding;fiduciary capacity;institutional cooperation;rapid urbanization;information service;data center;societal need;social safeguard;economic integration;river stream;long-term weather;climate forecast;disaster preparedness;climate adaptation;mitigation measure;environmental benefit;heavy load;metal works;environmental risk;improved service;construction waste;metal scrap;measuring equipment;local ngo;river forecast;emergency response;public place;environment section;seasonal basis;hydropower output;institutional responsibilities;water availability;environmental issue;financial agreement;hazard monitoring;energy production;cost of energy production;political will;climate uncertainty;project operation;regional network;national institutional;water information;statutory authority;eligibility criterion;grant funds;socio-economic development;national ownership;institutional management;national capacity;preventive measure;information products;risk assessment;extreme conditions;remote location;river flooding;flash flood;cost-effective solution;significant challenge;climate services;socioeconomic impact;regular events;border cooperation;governmental agency;institutional resource;Disaster Management;involuntary resettlement;hazard map;surface water;public health;meteorological equipment;rural area;climate extremes;safeguard issue;irreversible impacts;adaptive capacity;regional cooperation;operational budget;electricity need;energy source;hydropower potential;mountainous region;agricultural activity;alluvial fan;vulnerable countries;agricultural yield;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.