Skip to Main Navigation

Mongolia - Ulaanbaatar Clean Air Project : environmental assessment (Vol. 3) : Environmental management plan (Inglês)

The development objective of the Ulaanbaatar Clean Air Project is to connect consumers in ger areas of Ulaanbaatar to heating services producing less particulate matter emissions and to develop selected medium-term particulate matter abatement measures in Ulaanbaatar. Negative impacts include: air pollution, water pollution, solid wastage, hazardous materials, and noise pollution. Mitigation measures include: 1) the company has a wastewater recycling plant which consists primarily of solids settling, after which all treated water is recycled back to the process; 2) all this waste is stockpiled at the plant site; 3) necessary measures are taken for proper storage of hazardous materials; and 4) take necessary measures to reduce or eliminate (fuel change, cover materials storage containers etc.) or move to more isolated area.

Detalhes

  • Data do documento

    2014/08/25

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E2861

  • Nº do volume

    3

  • Total Volume(s)

    3

  • País

    Mongólia,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2014/08/25

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental management plan

  • Palavras-chave

    employee will re;safety at work;Environmental and Social Safeguard;construction work;site visits;chemical fertilizer use;wet season;number of complaints;quantity of waste;alternative water source;construction contractor;safety of pedestrian;dump site;grass seed;organic matter;monitoring equipment;religious authorities;construction phase;phone call;road traffic;soil analysis;safety equipment;dust emission;formal declaration;International Phone Call;water consumption;shrub species;construction period;car driver;water use;express request;civil works;fertilizer plant;noise control;regular meetings;emission standard;safety construction;truck traffic;equipment safety;monthly reports;noise level;meteorological condition;religious sites;archaeological site;adjacent areas;site monitoring;organic waste;preventive measure;excessive use;safety reason;fuel storage;truck transport;traffic police;municipal agencies;safe access;waste companies;water practice;top soil;plant biomass;water company;excavation work;water monitoring;compost quality;order quantity;environmental aspect;domestic waste;noise pollution;environmental monitoring;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.