1989/06/29
-
TIpo de documento
Relatório de Conclusão do Projeto.
-
No. do relatório
7913
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Tanzania - Tourism Rehabilitation Project
-
Palavras-chave
civil works;Hotel and Tourism Training Institute;local competitive bidding;foreign exchange;suspension of disbursement;Change in Leadership;availability of material;foreign exchange fund;deep sea fishing;maintenance and repair;supply and installation;impact of tourism;allocation of credit;country exchange rate;foreign exchange allocation;lack of control;equipment and supply;bed occupancy rate;lack of commitment;cessation of operation;condition of effectiveness;foreign exchange control;quality of supervision;exchange rate movement;credit agreement;quality of work;physical work;contract amount;tourism industry;tourist attraction;variation order;credit effectiveness;promotional campaign;airport terminal;marketing tool;imported materials;tourist facilities;sanitary facility;terminal building;foreign expenditure;overseas training;sanitary installations;dispute arising;government delegation;electrical work;alternative financing;sectoral priority;local contractor;cost escalation;local funds;project costing;audited account;tourism services;trained manpower;domestic price;drainage channel;project execution;capital expenditure;Disbursement - Total;procurement process;qualified accountants;macroeconomic problem;accounting staff;fixed asset;wildlife situation;stop valves;public area;intensive training;Financing plans;scarce resource;radio transmitter;hotel managers;overseas marketing;budgetary constraint;Exchange Rates;original contract;arbitration procedure;international passenger;cash shortage;legal proceeding;project startup;maintenance expenditure;construction equipment;pending payment;contractor claim;adequate maintenance;Contractual obligations;budget allocation;furniture repair;cooling system;plumbing accessories;electrical system;contract termination;special arrangement;income statement;related contract;drainage system;contract data;contractual dispute;interrelated factors;management capacity;building material;electrical contractor;disbursement profile;minimum requirement;temporary employment;physical implementation;physical needs;archaeological site;local teacher;subsidiary loan;marketing program;retroactive financing;site selection;train activity;equity fund;international airport;sandy beaches;passenger facility;marketing campaign;promotional material;tourist travel;cost containment;social value;hotel operators;private investor;construction management;engineering study;remote area;short supply;procurement procedure;premature termination;residual effect;advance expenditures;local costs;beach erosion;export industry;physical deterioration;tourism sector;long-term effect;foreign offices;rehabilitation need;financial datum;plumbing system;Fixed Assets;debt service;marginal improvement;tourist traffic;incremental revenues;charter airline;foreign investor;program consisting;practical training;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.