The development objectives of the Railway Regenerative Braking Project for India are contribute to development of sustainable urban transport by providing energy efficient braking technology in Electrical Multiple Units (EMUs); and reduce global emissions of carbon dioxide. Negative impacts include: air pollution, noise pollution, traffic management and road safety, construction vehicle/equipment exhaust, water quality, soil erosion, and storm water and drain maintenance. Mitigation measures include: 1) monitoring of noise levels at sensitive receptors as per monitoring plan, the plans shall include the installation of noise barriers, including additional road side plantation where practical; 2) all drains to be maintained and cleaned periodically; 3) exhaust emissions from all construction vehicles shall adhere to vehicle emission norms; 4) the work shall consist of measures as per design, or as directed by the engineer to control soil erosion, sedimentation and water pollution, through use of dikes, sediment basin, mulches, grasses, slope drains and other devices; 5) temporary contamination of creek water due to runoff from construction site, consisting of contaminants such as soil, sanitary wastes and oily wastes; and 6) traffic management plans shall be prepared, traffic control measures including speed limits to be enforced strictly traffic volume and speed to be monitored to record benefits achieved from the project.
Detalhes
-
Data do documento
2002/01/01
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E2548
-
Nº do volume
14
-
Total Volume(s)
-
País
-
Região
-
Data de divulgação
2010/09/22
-
Disclosure Status
Disclosed
-
Nome do documento
Final report of community environmental management plan (CEMP) for permanent resettlement site of MSDRC at Dindoshi
-
Palavras-chave
storm water;community environmental management;total cost of maintenance;overhead tank;quality of water;monitoring indicator;service action;Solid Waste Management;spread of disease;disposal of garbage;case of default;solid waste handling;street light;disposal point;local ngo;garbage collection;sewer line;water tank;sewage flows;shop owner;electric supply;gas cylinder;rain water;treated sewage;green area;urban service;underground water;environmental parameters;fresh air;unhealthy condition;sinking fund;road access;dry season;reinforced concrete;cast iron;iron rod;sanitary napkins;illegal connection;vegetable matter;broken glass;garbage bins;mitigatory measure;drainage system;local taxes;sewerage system;infrastructural facility;budget provision;general budget;Urban Infrastructure;corrective action;local law;private doctors;ration shop;kerosene stove;security arrangement;phone call;cost of distribution;water meter;adjacent construction;bus stop;approach road;garbage dumping;natural drainage;International Phone Call;health facility;local school;bus service;living condition;building society;inspection chambers;resettlement sites;maintenance expenses;health status;water sample;telephone repairs;commercial establishments;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.