Detalhes
-
Autor
William Young
-
Data do documento
2020/11/23
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR43769
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/11/23
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Zarafshon Irrigation Rehabilitation and Management Improvement Project - P158576 - Sequence No : 06
-
Palavras-chave
management improvement; Irrigation Rehabilitation; public works program; Recipient Executed Activities; Investment Project Financing; irrigated area; yield increase; irrigation infrastructure; irrigation canal; food crop; protection structure; institutional base; pumping station; irrigated land; canal system; pipeline system; risk category; crop season; operation risk; flow measurement; direct beneficiaries; ongoing support; farm level; flow control; irrigation system; hydraulic structure; water global; water measurement; service contract; irrigation plan
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.