The Bank established a specific policy and procedures for environmental assessment and related environmental analyses of International Bank for Reconstruction and Development (IBRD) lending operations. Under this environmental assessment process, the type, timing, and main issues of environmental analysis to be performed by the borrower are to be confirmed at the time that a given lending operation is initiated into the Banks prospective lending program and thereafter reported and updated on a quarterly basis in the monthly operational summary. This report focuses on the monthly operational summary of Bank as of October 1971.
Detalhes
-
Data do documento
1971/10/14
-
TIpo de documento
Resumo de Desembolsos Mensais
-
No. do relatório
146272
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/06/06
-
Disclosure Status
Disclosed
-
Nome do documento
Monthly Operational Summary of Bank and IDA Proposed Projects (as of October 12, 1971)
-
Palavras-chave
East African Community; appraisal mission; mission in field; qualification of bidder; qualifications for bidders; water and sewerage; invitation to bid; fishing port; completion of appraisal; letter of intent; prequalification of bidders; water supply component; steel work; development finance company; receipt of bid; federal highway; credit bank; technical assistance requirement; call for bids; approval of loan; urban development; source of financing; retroactive financing; joint financing; preparation mission; civil works; Power Generation; power transmission; parallel financing; land development; mortgage bank; reconnaissance mission; project identification; engineering service; seed production; urban study; marine transport; land settlement; railway electrification; storage field; foreign partner; technical appraisal; microwave equipment; foreign exchange; prospective borrower; harbour board; agricultural bank; road section; city water; tree crop; government action; urban transport; access road; power authority; forest industries; Consulting services; grain storage; telecommunications equipment; highway planning; construction detail; port expansion; steel plant; salinity control; education mission; flood control; dry season; Oil Pipeline; port authority; wholesale market; supply scheduled; project selection; procurement procedure; international bidding; reservoir area; geological condition; water authority; oil palm; road maintenance; rolling stock; railway engineering; logging concessions; equipment financing; credit proceeds; financing plan; coffee processing; Financing plans; water discussion; financial plan; mechanized farming
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.