Tanzania - Dar Es Salaam Sewerage and Sanitation Project (Inglês)

Detalhes

  • Data do documento

    1991/06/28

  • TIpo de documento

    Relatório de Conclusão do Projeto.

  • No. do relatório

    9731

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Tanzânia,

  • Região

    África,

  • Data de divulgação

    2010/06/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    Tanzania - Dar Es Salaam Sewerage and Sanitation Project

  • Palavras-chave

    construction of pit latrine;ventilated improved pit latrine;extension of closing date;waste stabilization ponds;low cost sanitation;supply and installation;health education component;cost recovery systems;treatment of waste;cost of vehicle;construction and rehabilitation;low-cost sanitation system;technical self sufficiency;septic tank waste;septic tank emptying;waterborne sewerage system;risk to health;maintenance and repair;cost of service;assurance of reliability;public health education;condition of effectiveness;low-cost sanitation component;pumping station;sewer connection;sanitary engineer;borrower's performance;vip latrine;project costing;sewerage connection;Sanitation Services;loan scheme;sea outfall;local contractor;sewerage infrastructure;institutional framework;financial practice;sanitation facility;urban population;project sustainability;consulting service;city council;procurement procedure;financial rate;audited account;pumping equipment;tariff increase;Consulting services;sewerage facilities;competitive bidding;staff management;operational staff;sewerage tariff;private construction;project identification;sanitation department;capital expenditure;statistical information;On-Site Sanitation;borrower performance;credit effectiveness;expatriate management;financial result;Basic Sanitation;legal framework;budgetary control;personnel change;local counterpart;external agencies;billing system;foreign consultant;baseline cost;school construction;financial procedure;procurement requirement;civil works;plant operation;positive income;pond systems;cash subsidy;cubic feet;fringe benefit;pumping plant;financial policies;procurement problems;operational problems;unforeseen circumstance;local procurement;reimbursement claim;government resource;exchange rate;Exchange Rates;institutional change;local artisans;school latrine;full participation;financial datum;financial information;local industry;inventory control;conventional sewerage;management improvement;sector priorities;Procurement Policy;manufacturing plant;competitive salary;bureaucratic procedure;aerial survey;financial system;sewerage component;capital facility;sewer service;hygienic practice;financial viability;connection cost;cholera outbreaks;project construction;credit disbursement;consulting engineer;financial analysis;financial environment;insufficient information;competitive basis;qualified technical;capital additions;sanitation operation;credit negotiation;water facility;bureaucratic inertia;rural area;supervisory responsibility;utility environment;administrative personnel;expatriate managers;management service;institutional relationship;sewerage bill;public acceptance;project risk;local funds;property owner;private contractor;vehicle purchase;earning capacity;internal plumbing;sea shore;environmental condition;personnel practice;annual expenditure;price contingency;construction work;work schedule;organizational arrangement;sewerage service;financial resource;tariff level;sanitation requirement;acceptable standard;respective year;credit approval;finance objective;Capital Investments;financial analyst;long range;primary reason;credit agreement;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.