China - Second Jianxi Highway Project : environmental assessment (Vol. 14) : Taihe-Ganzhou Expressway Mainline, the Inter-connecting roads, and the rural roads improvement program (RRIP) : environmental assessment summary (fourth edition) (Inglês)

This is an environmental assessment of the Second Jiangxi Highway Project for China, which improves four rural roads. These are some of the negative environmental impacts and their proposed mitigations. Land subject to plant removal will have vegetation restored, including a greenbelt set up along roadsides. Drainage works will include ditches to prevent soil erosion, run-off, floods, and interference with irrigation. Earth borrowing and waste disposal will comport with design requirements and topsoil will be reclaimed and restored. Dumped earth will be arranged and compressed in tight layers according to the height of the retaining wall. Construction during the rainy season will avoid the rainy season. Oil from vehicles and construction machines will be collected and disposed of in a landfill. Soundproofing windows will reduce noise. Noise at construction sites will be controlled by restricting time and place of activity, and by consulting residents who will be impacted when necessary and compensating them. Workers themselves will wear protective helmets and ear-plugs. Dump sites quarries, and mixing plants will be located beyond residential areas, material covered when hauled, and sites sprayed in order to minimize dust.

Detalhes

  • Autor

    Highway Research Institute, Jiangxi Provincial En

  • Data do documento

    2001/01/31

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E425

  • Nº do volume

    14

  • Total Volume(s)

    14 (Ver todos os volumes)

  • País

    China,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2010/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Taihe-Ganzhou Expressway Mainline, the Inter-connecting roads, and the rural roads improvement program (RRIP) : environmental assessment summary (fourth edition)

  • Palavras-chave

    connecting road;Land Acquisition and Resettlement;annual average wind speed;pollution source during construction;water pollution prevention;water pollution control;impact of land;sensitive locations;soil erosion;environmental protection measures;waste disposal site;noise mitigation measure;sewage treatment facility;ambient air quality;law and regulation;rise and fall;annual average temperature;annual average rainfall;construction and operation;department of construction;irrigation and drainage;agriculture and industry;surface water pollution;outbreak of disease;environmental protection department;environmental assessment summary;municipal transportation;construction camp;construction site;construction machine;building material;acoustic environment;hilly land;cultural relic;land occupation;environmental factor;environmental issue;grade separation;construction material;alluvial plain;hilly area;noise monitoring;paddy land;non-governmental organization;drainage system;hazardous cargo;traffic noise;middle school;construction work;main road;safety inspection;flood control;bulky materials;septic tank;flood frequency;rainy season;flying dust;Natural Resources;retaining wall;construction phase;hazardous substance;arable land;flat terrain;water quality;stabilized soil;vehicle transport;waste site;environmental change;construction stage;water bodies;public survey;monitoring plan;water conservation;top soil;haul vehicles;organizational management;haul roads;personnel training;environmental monitoring;local resident;wild life;slope protection;construction period;labor protection;plant design;concrete mix;road building;safe discharge;drainage ditch;road transportation;protection work;high school;land compensation;village committee;local borrowing;weather condition;Traffic Safety;drainage work;human body;safety committee;vehicle load;toll station;remedial measure;local monitoring;high noise;vertical indicators;noise standard;protection level;environmental aspect;stone work;prevention measures;social consideration;geological condition;ambient noise;school time;Local Govemment;resettlement land;urban development;sediment control;comprehensive transportation;atmospheric pollution;traffic condition;check dam;grass plant;water drainage;national highway;ground surface;agricultural field;heavy soil;water requirement;water resource;personal protection;road section;highway construction;noise impact;hot summer;underground water;social economy;production base;prefeasibility study;ecological environment;geographic position;subtropical zone;environmental department;highway transportation;cold winter;monsoon climate;noise level;noise reduction;surface soil;tourism resource;temperature difference;rare species;cash crop;sugar cane;forest coverage;good ventilation;coniferous tree;river flow;water source;state council;management regulation;research institute;environmental experts;project finance;operational procedure;Traffic Jam;Traffic Accident;accident risk;traffic law;road management;road service;rush hour;gas inspection;public consultation;construction scale;technical standard;state policy;expressway construction;environmental standard;ecological restoration;irrigation system;hilly terrain;Parking Lot;industrial building;traffic engineering;natural reserve;physical examination;medical treatment;local public;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.