Disclosable Restructuring Paper - Ningbo Municipal Solid Waste Minimization and Recycling Project - P123323 (Inglês)

The objective of the Ningbo Municipal Solid Waste Minimization and Recycling Project is to assist selected districts in Ningbo Municipality to increase the volume and proportion of municipal solid waste recycled with processes for waste separation at source and recycling. The project's current closing date is March 31, 2019 and another 12 months is needed to fully achieve the project objectives and improve solid waste management in Ningbo. MOF has sent the Bank a request letter for a one year project extension. The extension will allow extra time (a) for the newly completed KWTP to get up to full operation and tweak any problems that might arise; (b) to fully operationalize the 6 new transfer stations and the recyclables sorting plant and together with the KWTP create an integrated system for segregated waste management; (c) to achieve targets for quantities of separately collected kitchen waste and recyclables; (d) to procure additional solid waste collection vehicles, now that the KWTP will soon be fully operational; (e) to further optimize the output-based incentive program; (f) to get the draft solid waste regulations in place; and (g) to complete resettlement housing. Making strides in all these areas will allow Ningbo to increase the volume and proportion of waste recycled to the target levels and improve its solid waste management generally.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.