Brazil - Itaparica Resettlement and Irrigation Project : Request for Inspection : Solicitacao de Painel de inspecao do Banco Internacional para reconstruocao e desenvolvimento - Banco Mundial, para o Projeto de Reassentamento dos Atingidos Pela Hidroelectrica de Itaparica (Português)

The Request for Inspection for The Itaparica Resettlement and Irrigation Project outlines problems caused to the indigenous communities displaced by the construction of the Itaparica dam. The Request, supported by the group Polo Sindical do Submedio Sao Francisco, states that the resettlement plans have not been fulfilled and that the better living conditions promised to the resettled people have not occurred. The Request acknowledges the importance of the dam in bringing electricity to millions of people, but also states that over 150,000 people were resettled and have not received the improved living conditions that were promised.

Detalhes

  • Data do documento

    1997/03/12

  • TIpo de documento

    Relatório e recomendação do Painel de Inspeção

  • No. do relatório

    28462

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Brasil,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2010/07/01

  • Nome do documento

    Solicitacao de Painel de inspecao do Banco Internacional para reconstruocao e desenvolvimento - Banco Mundial, para o Projeto de Reassentamento dos Atingidos Pela Hidroelectrica de Itaparica

  • Palavras-chave

    Dams; Hydropower projects; Indigenous culture; Resettlement; Indigenous communities; Living conditions; Irrigation

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.