This project is the second phase of a national state roads program that covers most Nigerian the states. The first phase covered the two the states of Kano and Jigawa. This project will cover the states of Oyo and Osun and includes: (a) road works -- implementation of selected high priority road works in the States' five - year economically justified road investment program including rehabilitation and strengthening works, paving of selected high volume unsurfaced roads and limited construction of new roads; (b) maintenance by contract -- initiation of a program of routine and periodic maintenance of roads by private contractors, including the development and training of small scale domestic contractors in using labor based and light equipment assisted construction methods; (c) vehicles and equipment -- purchase of vehicles and equipment to strengthen institutional capacity to plan, design and supervise the project work; and (d) institutional development -- establishment of appropriate institutional arrangements within the State Ministries of Works (SMOWs) and support for planning, design, construction, maintenance and supervision of roads, and for contract management.
Detalhes
-
Data do documento
1993/03/16
-
TIpo de documento
Relatório sobre Avaliação do Pessoal
-
No. do relatório
11327
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Nigeria - Second Multi-state Roads Project
-
Palavras-chave
state road;infrastructure operation;Executive Offices;Economic Rate of Retum;average for sub-saharan africa;early stage of development;environmental impacts of road;road user charge;total maintenance cost;road maintenance work;variable interest rate;management of road;local government agency;access to training;classes of road;road user cost;road accident statistic;road safety improvement;trunk road network;state highway system;vehicle license fee;change of ownership;amount of fund;road safety enforcement;foreign exchange risk;data collection activity;rural road system;rate of inflation;per capita income;management of state;cost recovery ratio;transfer of skill;maintenance of road;petroleum product price;lack of staff;demand for road;gravel road;road work;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.