Detalhes
-
Data do documento
2007/02/08
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR12574
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/28
-
Disclosure Status
Disclosed
-
Nome do documento
St Vincent & Grenadines - Emergency Recovery And Disaster Management Project
-
Palavras-chave
emergency operations center;quality at entry;disaster preparedness;civil works;readiness for implementation;service and infrastructure;cost of work;rehabilitation of infrastructure;early warning system;irrigation and drainage;flood protection work;monitoring indicator;natural disaster;prevention measures;management procedure;emergency equipment;project costing;disaster committee;community involvement;Disaster Management;Environmental Assessment;storm surge;capacity assessment;disproportionate impact;management responsibility;capacity enhancement;base case;environmental objective;income insecurity;insufficient information;emergency procedure;good performance;sea defense;emergency response;poverty goal;respective responsibility;division manager;meteorological information;environmental analysis;government administration;project datum;physical facility;environmental capacity;institutional strengthening;community management;weather information;
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.