Before the project started, Road No. 13, the backbone of the road system in Lao PDR, was in serious need of improvement. Its gravel surface limited travel speeds to around 35 km per hour. Other provincial and district roads were also in a state of disrepair with road maintenance only rarely undertaken across the network. Project upgraded a 200-km section of Road 13 and introduced a periodic maintenance program using competitive bidding. It also set out to improve the Governments capacity to better manage its national road assets.
Detalhes
-
Data do documento
2007/03/27
-
TIpo de documento
Informativo
-
No. do relatório
92855
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2015/02/23
-
Disclosure Status
Disclosed
-
Nome do documento
Upgrading Lao PDR's major artery
-
Palavras-chave
road maintenance;competitive bidding;road system;government's capacity;road sector;vehicle operating cost;cost recovery mechanism;local economic activity;source of income;source income;road section;government's commitment;donor support;gravel surface;district road;funding mechanism;infrastructure asset;road asset;agricultural area;routine maintenance;private contractor;civil works;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.