China - Huai River Water Pollution Control Project : environmental assessment (Vol. 3) : Summary report (Inglês)

This is the environmental assessment (EA) which identifies potential negative impacts resulting from the implementation of the Huai River Water Pollution Control Project, reviews the project area to examine the physical, and biological environmental aspects, and proposes mitigating measures on specifically, the Anhui and Shandong Province components. Socio-cultural aspects are covered separately in the Resettlement Action Plan. Potential construction, and operational impacts are relatively minor, and have been sorted according to their geographic location, addressed in the design of wastewater collection, and treatment facilities, to control effluent discharge and sludge disposal. Mitigating measures include budget allowances for laboratory construction and equipment, to perform the required testing by each utility. Detailed technical assistance, and training programs will be developed to address environmental institutional strengthening, and monitoring. Mitigation include: 1) contract provisions, through precautionary clauses to minimize dust, and air quality, and ensure safety; 2) limited operating schedules, and adequate equipment to abate noise disturbances; 3) ordinance enforcement to improve treatment systems, and solid waste collection on waterways; and, 4) monitor wastewater discharges through sewerage inspections, and testing.

Detalhes

  • Autor

    Shandong Provincial Scientific Research and Design - Institute of Environmental Protection / Hefei Design Institute / Mott MacDonald - ERM

  • Data do documento

    2000/09/30

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E380

  • Nº do volume

    3

  • Total Volume(s)

    3

  • País

    China,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2010/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Summary report

  • Palavras-chave

    scheme will;litres per capita per day;industrial pollution control;river water;township and village enterprise;interest during construction;wastewater collection and treatment;construction of wastewater collection;cost of pollution control;charge for wastewater service;wastewater treatment plant;combined sewer system;drinking water source;municipal wastewater treatment;local government sector;surface water quality;mitigation measure;resettlement action plan;real estate value;industrial pollution sources;Urban Water Supply;raw sewage discharge;annual river flow;surface water runoff;air quality impact;water pollution control;wastewater treatment facility;quality of wastewater;improved water quality;water quality problem;increase in quantity;water quality monitoring;sanitary landfill site;quality of water;average incremental cost;public health improvement;local government official;construction and equipment;agriculture and industry;benefits to fisheries;sea water quality;unit of measurement;wastewater treatment system;debt equity ratio;improve water resource;treatment facilities;pumping station;pipe network;main sewer;environmental monitoring;domestic wastewater;monitoring cost;sea outfall;environmental infrastructure;concrete pipe;water area;wastewater company;pump station;dry season;industrial wastewater;local funding;people land;basin area;black liquor;environmental performance;cod concentration;paper mill;river control;protection zone;bathing beach;urban plan;treated effluent;construction period;compensation plan;Exchange Rates;educational level;public official;participation activities;survey results;urban resident;trade union;government land;removal rate;wastewater facility;project plan;primary treatment;adequate compensation;valuable fish;public support;spawning ground;river pollution;pressure pipe;currency name;environmental problem;extensive growth;municipal government;monitoring data;wastewater plant;construction contractor;annual monitoring;performance assessment;waste minimisation;river system;recreational purposes;flood period;volume control;public use;fishery resource;river course;power network;emergency use;natural drainage;natural environment;living quality;pollution reduction;downstream section;institutional strengthening;national environmental;flood season;secondary treatment;international approaches;donor support;land acquisition;River basin;incomplete data;beneficial use;wastewater operation;wastewater discharge;assimilative capacity;municipal treatment;wastewater agencies;groundwater contamination;Livestock Production;pollution problem;municipal sewage;sewerage scheme;domestic output;increased revenue;laboratory equipment;maintenance equipment;sewerage network;environmental condition;nature reserve;laboratory facility;construction impact;geographic location;monitoring activity;storage purpose;odour problems;sludge treatment;financial analysis;power station;social environment;maintenance expenses;capital budget;pipeline construction;financial parameter;treatment process;working ratio;sludge disposal;present value;development time;septic tank;account receivable;sewerage tariff;treatment capacity;site selection;water problem;interceptor sewer;utility company;pipe material;public perception;sewerage system;Environmental Assessment;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.