Skip to Main Navigation

India - Rampur Hydropower Project : restructuring : Main report (Inglês)

The development objective of the Rampur Hydropower Project is to improve the reliability of India's Northern electricity grid through the addition of renewable, low carbon energy from the Rampur hydropower project; and to improve the effectiveness of Satluj Jal Vidyut Nigam Limited (SJVN) with respect to the preparation and safe implementation of economically, environmentally, and socially sustainable hydropower projects. The changes are under the project restructuring is: extension in the loan closing date from March 31, 2013 to December 31, 2014 - necessitated as the implementation of the main component A (i.e. construction of the 412 MW Rampur run-of-river hydroelectric scheme) has been delayed due to poor geology being encountered in the head rate tunnel excavation; the available funds under the component are to be entirely reallocated to the main component; and change in the implementation responsibility for the Sustainable Community Development Program (SCDP) to include the State of Himachal Pradesh (in addition to the borrower).

Detalhes

  • Data do documento

    2011/10/04

  • TIpo de documento

    Documento do projeto

  • No. do relatório

    64732

  • Nº do volume

    1

  • Total Volume(s)

    2

  • País

    Índia,

  • Região

    Sul da Ásia,

  • Data de divulgação

    2011/10/14

  • Disclosure Status

    Disclosed

  • Nome do documento

    Main report

  • Palavras-chave

    availability, balance, Bank Financing, Bank loan, beneficiary, borrower, capacity building, Carbon Dioxide, carbon energy, Community Development, competitive bidding, CURRENCY, deposit, Electricity, Emission, Emission Reduction, Equipment, Exchange Rate, Financial Management, Head, Hydro Power, Hydro Power Station, hydroelectric scheme, HYDROPOWER, hydropower developer, hydropower development, HYDROPOWER PROJECT, hydropower projects, Internal Rate of Return, International Bank, irrigation, kilowatt hour, LOAN, loan amount, loan appraisal, loan approval, Loan proceeds, power availability, Power Station, power supply, pump, RAP, Rate of Return, Resettlement, river, sustainable hydropower, tax, thermal plants, turbulence, villages, water supply, youth

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.