Detalhes
-
Autor
-
Data do documento
2020/07/14
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR42406
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/07/14
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Uganda Grid Expansion and Reinforcement Project (GERP) - P133305 - Sequence No : 08
-
Palavras-chave
electricity transmission company; Debt Service Coverage Ratio; Access to Electricity; transmission line; Investment Project Financing; transmission infrastructure; supply capacity; electricity service; bulk power; risk category; generation capacity; operation risk; electricity connection; international travel; contract signature; household connection; travel restriction; consultancy service; capacity enhancement; capacity assessment; bulk electricity; procurement process
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.