The main thrust of this report is to define and weigh both negative impacts and positive benefits of the Yunnan Environmental Project (YEP) and to identify appropriate measures to mitigate adverse impacts in the project cities. The objectives of this report are: 1) to summarize the results of the environmental impact assessments for each of the YEP World Bank funded sub-projects; 2) to identify both the critical environmental problems to be addressed, and those produced by project implementation; 3) to assess the merits of alternative solutions to these problems in environmental, social and economic terms; and 4) to evaluate and recommend interventions for mitigation of problems. Chapter 2 of the report discusses the institutional environment that governs the environment in Yunnan Province. Chapter 3 describes the components of the YEP. Chapter 4 describes the baseline conditions in the project area. Chapter 5 assesses the impacts and mitigation measures required for the various proposed components and summarizes the cost and benefits for each component. Chapter 6 is devoted to discussions on the alternatives based on the environmental and economic assessments. Chapter 7 describes the public consultation and participation process together with the results of the surveys carried out. Chapter 8 gives a brief summary of the resettlement proposals. Finally, chapter 9 describes the procedures required to monitor the performance of the proposed components to assess their effect on improvements of the environment of Lake Dianchi.
Detalhes
-
Autor
Yunnan Institute of Environmental Sciences Montg
-
Data do documento
1996/02/29
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E123
-
Nº do volume
3
-
Total Volume(s)
3
-
País
-
Região
-
Data de divulgação
2010/07/01
-
Nome do documento
China - Yunnan Environmental Project : environmental assessment report
-
Palavras-chave
Environmental impact assessment; Environmental degradation; Project implementation; Surveys; Resettlement; Performance appraisal; Project monitoring; Environmental monitoring; Water quality management; Industrial pollution; Pollution control; Urban environment; Environmental management; Training; Construction; Financial management; Project management; Sewage; Water supply; Solid waste management; Sanitation; Technical assistance
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.