Skip to Main Navigation

Burundi-Multi-Sector Infrastructure Project : Burundi - Multi-Sector Infrastructure Project (Inglês)

Detalhes

  • Data do documento

    2008/03/17

  • TIpo de documento

    Documento de informações do projeto

  • No. do relatório

    AB3372

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Burundi,

  • Região

    África,

  • Data de divulgação

    2010/07/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Burundi - Multi-Sector Infrastructure Project

  • Palavras-chave

    rehabilitation of transmission and distribution network;performance contract;access to water supply;preparation of bidding documents;electricity supply system;life expectancy at birth;water supply and sanitation;transmission and distribution system;reliability of water supply;physical cultural resources;adequate supply of water;large industrial consumer;water supply service;solar power system;consolidation of peace;promotion of energy;water treatment capacity;leak detection equipment;lack of investment;water and electricity;infant mortality rate;long term planning;basic water service;slow sand filter;continuity of service;conservation of water;delivery of service;availability of water;raw water intake;energy and water;alternative energy source;short term investment;water supply component;large consumer;thermal generation;allocation of fund;quality of supply;human capital;hydropower plant;electricity meters;power factor;pumping system;electricity grid;electricity component;loss reduction;efficiency improvement;involuntary resettlement;public awareness;production facility;peak power;awareness campaign;electricity service;incandescent bulb;local capacity;efficiency gain;Water Services;regulatory entity;household level;early detection;supply gap;information campaign;public consultation;bill recovery;demand management;hydropower capacity;commercial viability;financial sustainability;primary focus;electricity network;Safeguard Policies;budgetary resource;tariff regime;household connection;financial model;financing source;safeguard policy;business survey;natural habitat;Indigenous Peoples;improved sanitation;potable water;monitoring data;Consulting services;waste water;commercial practice;safe transportation;public entity;water use;government building;accounting practice;operational management;energy conservation;supply side;satisfactory manner;household survey;Urban Planning;water component;household consumers;financial deficit;Wind Power;capacity strengthening;credit instrument;pumping rate;appraisal mission;water level;pumping station;generation capacity;energy need;water flow;leakage reduction;national grid;agricultural production;political progress;fiscal management;service coverage;social stability;public health;operational capacity;treated water;rehabilitation need;total debt;long-term planning;improving governance;social indicator;grid supply;Micro Hydropower;demand growth;productive activity;land area;landlocked country;specific performance;competitive bidding;sectoral strategy;financial indicator;project negotiation;contractual relationship;engineering service;emergency repair;secondary distribution;public standposts;Sanitation Services;independent oversight;regulatory mechanism;water filtration;mutual debt;international consultant;consumption;improved service;small operator;sanitation practice;user preference;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.