Skip to Main Navigation

Kenya - Electricity Expansion Project : environmental assessment (Vol. 11) : Environmental impact assessment for the Kabarak University 33/11 kV substation in Rongai Constituency (Inglês)

The objectives of the Electricity Expansion Project for Kenya are to: (a) increase access to electricity in urban, peri-urban and rural areas; and (b) improve the efficiency, reliability and quality of service to consumers, while sustaining the policy, institutional and regulatory environment needed for these results to materialize. Negative impacts include: soil erosion, contamination of soil, decreased air quality due to dust emission, solid waste, impacts on water quality and water resources, noise and vibration, visual Intrusion and aesthetic impacts, traffic congestion, accidents as a result of increased traffic, damage to roads and transport infrastructure, occupational Health and safety impacts, and impacts on public health. Mitigation measures include: during construction, where water is available, sprinkle the construction area with water to keep dust levels down; dust masks should be provided to all personnel in areas prone to dust emissions throughout the period of construction; drivers of construction vehicles must be supervised so that they do not leave vehicles idling and they limit the vehicular speeds so that dust levels are lowered; no burning of any waste materials whatsoever should be permitted within the site during construction; areas cleared of vegetation at the substation site, and where no substation structures are, shall be rehabilitated by grass to prevent soil erosion; drainages shall be constructed to control storm water; noise pollution shall be mitigated by ensuring that noisy operations are done during the day only and also by properly maintaining construction machinery; HIV/AIDS awareness campaigns shall be carried out for employees and the surrounding members of public; solid wastes generated, shall be carted away as soon as possible for appropriate disposal; and occupational safety measures shall be put in place, including provision of suitable and adequate personal protective clothing and equipment to construction employees.

Detalhes

  • Autor

    Lucy,Dennis F.

  • Data do documento

    2012/01/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    SFG1101

  • Nº do volume

    11

  • Total Volume(s)

    13 (Ver todos os volumes)

  • País

    Quênia,

  • Região

    África,

  • Data de divulgação

    2015/05/19

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental impact assessment for the Kabarak University 33/11 kV substation in Rongai Constituency

  • Palavras-chave

    Environmental and Social Impact Assessment;united nations framework convention on climate change;kv substation;convention on biological diversity;transmission and distribution system;construction of access road;civil aviation act;Occupational health and safety;kv transmission line;Access to Electricity;demand for electricity;gap in knowledge;Environmental Management Plan;national economic growth;construction and operation;storm water drainage;project affected persons;allocation of fund;risk of accident;implementation of mitigation;entire life cycle;high population density;natural resource availability;heavy construction equipment;aids awareness campaigns;personal protective clothing;national environmental law;electricity distribution system;safety of dam;negative environmental impact;hazardous waste materials;power system development;incidence of disease;solid waste generation;environmental management standards;rain water harvesting;environmental management activities;rural urban migration;mitigation measure;construction material;baseline information;stakeholder consultation;topographic feature;baseline conditions;sea level;construction phase;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.