This Resettlement Plan (RAP) is in compliance with the Laws and Regulations of China and local governments, as well as with the Bank's Operational Guidelines. It sets an action plan for the Resettlement and Rehabilitation of the Project Affected Persons (PAPs) to ensure they will benefit from the project, and that their standard of living will improve, or at least be restored following project implementation. Acquisition of land and of other assets due to project implementation will adversely affect the livelihood of persons who live, work, or earn their living from the land to be acquired for project purposes. The RAP comprises four volumes, i.e., Sichuan Mianyang RAP (V. 1), Sichuan Panzhihua RAP (V. 2), Xining District, Suining City RAP (V. 3), and Yibin Urban Riverside Loop Line Road RAP (V. 4). The project design takes into consideration alternatives to minimize socio-economic impacts, and avoid as much as possible residential areas and farmland. An independent third party will be responsible for monitoring land acquisition and resettlement issues, including compensation to be provided to project affected people. Compensation will be in the form of land replacement or cash compensation, to include loss of land, physical structures, and lost assets - loss of productive trees and crops, and other productive assets, including loss of income due to lost employment. Monitoring criteria will be in place to ensure compliance with the RAP, as will grievance mechanisms should conflict occur.
Detalhes
-
Autor
-
Data do documento
2006/07/26
-
TIpo de documento
Plano de reassentamento
-
No. do relatório
RP360
-
Nº do volume
1
-
Total Volume(s)
5
-
País
-
Região
-
Data de divulgação
2010/07/01
-
Disclosure Status
Disclosed
-
Nome do documento
Mianyang component
-
Palavras-chave
bridges, cities, communes, communities, Compensation, compensation criteria, compensation procedures, construction, construction materials, Environmental Capacity, farmers, farms, habitat, Households, houses, Housing, Implementation Procedures, insurance, Involuntary Resettlement, Land Acquisition, Land Administration, land development, land use, mitigation, parks, Project Affected Persons, project areas, Project Impacts, property losses, RAP, Resettlement, resettlement activities, resettlement compensation, Resettlement Monitoring, resettlement planning, resettlement plans, Resettlement Policy, resettlers, roads, rural areas, scheduling, towns, townships, Urban, Urban Development, Urban Environment, urban infrastructure, urban population, urbanization, urbanization process, utilities, villages, vulnerable groups
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.