Skip to Main Navigation

Pakistan - First Phase of the Dasu Hydropower Project : Environmental Assessment (Vol. 1 of 3) : Environmental and Social Impact Assessment for Dasu Transmission Line Project : Main Report (Inglês)

The development objective of the First Phase of the Dasu Hydropower Project for Pakistan is to facilitate the expansion of electricity supply of hydro-power in Pakistan. Some of the negative impacts and mitigation measures include: (1) contractor will take extra measures to prevent fuel and other hazardous material spillage; (2) contractor will ensure zero disposal of spoils in the water bodies and take measures to prevent water pollution; (3) proper...
Exibir mais

Document also available in : Urdu, Inglês

DETALHES

  • 2019/11/01

  • Avaliação Ambiental

  • SFG5884

  • 1

  • 3 (Ver todos os volumes)

  • Madagascar,

  • Sul da Ásia,

  • 2019/11/22

  • Disclosed

  • Environmental and Social Impact Assessment for Dasu Transmission Line Project : Main Report

DOWNLOADS

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

This document is being processed or is not available.