The development objective of the Indonesian Second Power Transmission Development (IPDT2)Group 2 is to fulfill the increase of electricity demand and to increase access to electricity sustain ably, by strengthening and increasing transmission network capacity of 150kV and 500 kV electricity in Sumatera, Java-Bali, Kalimantan and Sulawesi. Some of the negative impacts and mitigation measures are includes :- (i) all land fields which will be acquired are farmlands in the form of rice fields owned by individual; (ii) compensation which allows the land owner to choose the replacement land, but in general land owners prefer to be paid in cash as the replacement of the lost land; (iii) all plants impacted by the expansion of project of GI 150 kV Sepatan Ext. will be cleared. (iv) plant inventory will be conducted based on the Compensation Standard of Plants Impacted by Project pursuant to Decree of Local Government; (v) all lands of GI 150 kV Sepatan Ext. will be certified after all processes of land clearance have been conducted; (vi) consultation with the residents whose assets are possibly impacted will be carried out. Thereafter, inventory upon the land and plants which will be acquired and census survey to the residents impacted by project, is witnessed by the local village government apparatus.
Document also available in :
Detalhes
-
Autor
-
Data do documento
2016/08/01
-
TIpo de documento
Plano de reassentamento
-
No. do relatório
SFG2511
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/10/03
-
Disclosure Status
Disclosed
-
Nome do documento
Dokumen rencana kerja pengadaan lahan
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.