Skip to Main Navigation

Thailand - Yanhee Multipurpose Project (Inglês)

The Yanhee Multipurpose Project for Thailand will assist in financing the construction of a multipurpose power center to be located 420 kilometers northwest of Bangkok on the Ping Piver, one of the main tributaries of the Chao Phya river, which is the most extensively used river in Thailand. It will impound flood water, store water for irrigation, produce power, and improve navigation in order to meet consumer power demands and increase agricultural production in Thailand. The project will accomplish these goals by: 1) constructing a large dam which would create a reservoir with a capacity of 12 billion cubic meters; 2) building two spillway tunnels to discharge unusually large floods; 3) constructing a powerhouse at the foot of the dam with an ultimate capacity of 560,000 KW; and 4) installing transmission lines to load centers in the central plain and Bangkok. These new additions will foster economic development through an increased power supply and higher levels of agricultural production.

Detalhes

  • Data do documento

    1957/08/31

  • TIpo de documento

    Memorando e recomendação do Presidente

  • No. do relatório

    P138

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Tailândia,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2010/06/24

  • Disclosure Status

    Disclosed

  • Nome do documento

    Thailand - Yanhee Multipurpose Project

  • Palavras-chave

    cubic meter of water;flow of water;rate of growth;water for irrigation;water for agriculture;condition of effectiveness;water irrigation;public investment expenditure;supply of power;transmission and distribution;sale of electricity;availability of fund;balance of payment;debt equity ratio;losses from flood;economic development plan;public investment program;thermal power station;Foreign Exchange Reserve;thermal generating capacity;foreign aid disbursement;official foreign exchange;external debt policy;transmission line;engineering consultant;debt service;bank finance;currency cost;distribution facility;agricultural benefit;generating plant;rice production;large reservoir;export earning;storage capacity;export earnings;dry season;power facility;independent agency;load center;total reserve;loan contract;financial difficulties;engineering study;Financing plans;utility system;electricity authority;export price;present cost;legal opinion;wholesale rate;large consumer;commercial enterprise;public power;thermal plant;import needs;adequate resources;Monetary Stability;real output;fiscal management;alternative investment;government investment;balanced development;flood control;trade balance;monetary position;Power Market;agricultural output;cash crop;Industrial Goods;national output;technical appraisal;minimum requirement;undue delay;national assembly;thermal capacity;installed capacity;transmission facility;Economic Policy;flood protection;river transportation;Electric Power;autonomous agency;economic stability;domestic lignite;initial debt;hydroelectric plant;agricultural production;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.