Detalhes
-
Autor
IEG Review Team
-
Data do documento
2021/04/28
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR0022515
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/04/28
-
Disclosure Status
Disclosed
-
Nome do documento
China - Jiangxi Wuxikou Flood Management Project
-
Palavras-chave
sustainable natural resource management; flood risk management system; improving urban water supply; soil erosion control; environmental and social management; climate-related hazard; project design and implementation; monitoring and evaluation system; global gross domestic product; Land Acquisition and Resettlement; central urban area; flood management system; flood protection level; early warning system; senior government official; million people; dam safety management; dam construction works; renewable energy generation; surface water quality; physical cultural resources; city water supply; social and environmental; flood control scheme; provision of equipment; external third party; global energy mix; seminars and workshops; cost component; loss of job; development of dam; water sector reform; flood control system; energy for all; mountain flash flood; flood protection standard; national water sector; flood prone area; local development priority; resettlement and rehabilitation; flood risk assessment; flood control infrastructure; climate change model; climate change adaptation; local flood management; entry rate; Natural disaster recovery; hydroelectric power plant; disaster risk management; sustainable development goals; Resettlement Policy Framework; negative social impacts; enabling conditions; critical natural habitats; flood management plan; drinking water source; panel of expert; environmental impact mitigation; achievement of outcome; Cumulative Environmental impact; reliable water supply; concrete gravity dam; decision support system; reservoir storage capacity; dam safety panel; outcome indicator; environmental flow; flood loss; flood awareness; reservoir operation; flood event; flood forecast; project costing; urban population; mitigation measure; hydropower plant; intermediate outcome; satisfactory completion; Urban Planning; integrated management; hydraulic model; project datum; safeguard policy; Consulting services; resettlement activities; long-term impact; construction supervision; Safeguard Policies; flood peak; financial sustainability; price level; downtown area; urban drainage; government commitment; community awareness; flood hazard; future flood; socio-economic context; safety plan; Flood Prevention; electricity production; involuntary resettlement; permanent loss; resettlement sites; watershed management; stated objective; project intervention; overflow spillway; fish breeding; long-term sustainability; risk identification; ecological restoration; resettlement process; counterpart funding; outcome targets; engineering design; dam height; cooperative planning; dry months; intermediate indicator; great flood; flood level; aquatic species; water flow; disaster preparedness; operational plan; water reservoir; value property; flood response; hydrological system; large flood; hydrological model; optimization model; hydropower production; transmission line; market system; fish resource; project operation; aquatic ecology; aquatic habitat; river environment; environmental monitoring; social safeguard; infrastructure facility; dike construction; Social Assessment; peak demand; dry season; city resident; Environmental Assessment; available data; internal consistency; project sustainability; several years; environmental risk; procedural requirement; Procurement Policy; procurement operation; audit finding; financial staff; job training; municipal water; ensuring compliance; resettlement arrangements; reservoir area; socio-economic development; historical data; fish biodiversity; environmental issue; large dam; ecological health; downstream communities; public good; Public Goods; model calibration; discount rate; several recommendations; appraisal costs; annual revenue; benefit analysis; statistical method; tourism potential; supply chain; transportation routes; client ownership; external agencies; institutional strengthening; project indicator; civil works; project negotiation; social sustainability; field visit
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.