Skip to Main Navigation

Panama - Second Port Project (Inglês)

The proposed project would upgrade and increase the capacity of the ports of Cristobal, Coco Solo Norte and Balboa and provide technical assistance for carrying out the works and training of APN staff. The Project would include: (a) Cristobal: strengthening and extension of an existing wharf to ease operations in the container handling area, and provision of container handling equipment, including two specialized gantry cranes and a mobile truck crane; (b) Coco Solo Norte: rehabilitation of areas to accommodate general cargo traffic and roll-on/roll-off traffic; (c) Balboa: relocation of the container handling operation, including dismantling of railway buildings, relocation of electrical power and other facilities, and structural modification of a wharf to accommodate a gantry crane, replacement of fenders, and provision of six fork-lift trucks.

Detalhes

  • Data do documento

    1982/05/31

  • TIpo de documento

    Memorando e recomendação do Presidente

  • No. do relatório

    P3110

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Panamá,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2010/06/24

  • Disclosure Status

    Disclosed

  • Nome do documento

    Panama - Second Port Project

  • Palavras-chave

    diversification of production and exports;water supply and sewerage;energy consumption per capita;rate of population growth;average number of person;population per hospital bed;access to safe water;life expectancy at birth;access to potable water;alternative sources of energy;civil works;public external debt;public sector deficit;debt service obligation;local competitive bidding;container storage area;cargo handling equipment;ship waiting time;income tax administration;ship service time;availability of data;population per nurse;public employment program;water and sewerage;Access to Electricity;adult literacy rate;movement of container;container handling equipment;external public debt;number of containers;debt service ratio;provision of equipment;procurement and disbursement;urban transport management;civil aviation authority;improvements in management;total labor force;large hydroelectric potential;taxes on gasoline;provision of credit;transmission and distribution;government's development strategy;infrastructure and services;volume of traffic;means of transportation;policy and institution;floating interest rate;multilateral development institution;private sector activity;Population Age structure;crude birth rate;crude death rate;family planning acceptors;food and nutrition;development of infrastructure;infant mortality rate;rural electrification program;population per physician;contract good;gnp per capita;port operation;general cargo;project costing;front-end fee;fixed asset;Fixed Assets;transit shed;bank lending;port area;state enterprises;port facility;foreign exchange;tariff adjustment;working ratio;Advisory services;highway maintenance;private investment;interest cost;container cargo;employment generation;metropolitan area;domestic issues;price policy;passenger traffic;absolute poverty;container traffic;freight traffic;social program;port administration;fishing port;financially self;shipping cost;stationary population;geographic location;copper mining;secondary enrollment;foreign carrier;basic school;general management;port worker;private activity;personnel training;cargo service;record management;agricultural output;telecommunication facilities;data processing;telecommunications facility;export crop;local expertise;international transport;domestic traffic;coastal shipping;world economic;Management Systems;international business;Agrarian Reform;railway company;risk analysis;arithmetic mean;Public Utilities;traffic growth;reinforced concrete;legal instrument;relative poverty;international passenger;rural population;gravel road;central administration;lending pattern;japanese yen;pupil-teacher ratio;price contingency;concessionary term;road access;financing plan;Financing plans;petroleum price;radio receiver;educational indicator;Livestock Production;mountain range;publicly guarantee;local training;operational practices;air travel;derelict building;equipment maintenance;social indicator;enrollment ratio;poverty target;participation rate;petroleum exploration;financing facility;transfer result;capital transfer;support price;feed grain;agricultural program;livestock credit;tropical tree;berth space;basic structure;tax incentive;urban development;international hotel;urban unemployment;cement plant;satisfactory progress;banking legislation;naval base;public finance;external borrowing;social infrastructure;educated workforce;medium-term outlook;international economy;sugar price;telecommunications company;tax revenue;valuable land;financial program;rental rate;private capital;registration fee;dairy product;vegetable oil;physical infrastructure;bank group;direct competition;sugar operation;coal equivalent;urban population;Population Projection;Population Density;agricultural land;private enterprise;domestic transport;food production;production system;storage facility;engineering consultant;foreign expenditure;Consulting services;retroactive financing;Natural Resources;glass container;wage policy;price control;dry cargo

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.