This Environmental Management Framework for the Georgia Second Education Realignment and Strengthening Program (APL 2) Project presents a general overview of environmental issues and potential impacts associated with the activities of APL 2 Project. The framework document is especially important in defining the approach to be taken to the assessment of environmental and social issues and their management, as well as the process of consultation with stakeholders and disclosure of related information. Whereas the aim of the project specific Environmental Assessments (EAs) and Environmental Management Plans (EMPs) is to ensure that projects are implemented in an environmentally acceptable manner, the EMF is aimed at ensuring that the choice and design of projects are inherently acceptable from an environmental perspective. EMF aims to establish a sound basis for mitigation, monitoring, and management at the project level. EMF as strategic document should highlight major impacts of concern in the sector and should prescribe standard approaches to subproject design and mitigation through environmental guidelines, manuals and monitoring requirements. This reduces the scope of work for individual EAs and EMPs for subprojects, and can positively influence investment activities throughout the sector or region. Specific EMPs to be developed further for each identified and approved project (construction of each school) should be developed on the basis of this general EMF and sample EMP provided as annex 2 to Volume 1 of this report.
Detalhes
-
Autor
Municipal Development Fund of Georgia
-
Data do documento
2006/09/18
-
TIpo de documento
Avaliação Ambiental
-
No. do relatório
E1454
-
Nº do volume
2
-
Total Volume(s)
2
-
País
-
Região
-
Data de divulgação
2006/09/21
-
Disclosure Status
Disclosed
-
Nome do documento
Environmental management framework : minutes of consultation
-
Palavras-chave
Environment and Natural Resources;construction of school building;Loan to Turkey;sanitation and hygiene;mitigation strategy;environmental threat;project goals;biological monitoring;international center;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.