Detalhes
-
Data do documento
2013/09/27
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR13866
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/25
-
Disclosure Status
Disclosed
-
Nome do documento
Albania - Transport Project
-
Palavras-chave
road safety education in school;Administrative and Civil Service Reform;implementation of road safety;Output and Performance Based;low per capita income;implementation of road maintenance;performance based maintenance contracts;rural services and infrastructure;road safety audit;social and environmental;quality of supervision;road maintenance contract;institutional framework;civil works;road section;increase in population;road-safety campaign;assessment of outcome;standard investment;road maintenance activity;road safety improvement;quality at entry;road safety activity;improving road safety;asset management system;law and regulation;category of services;financial management arrangement;annual road maintenance;road sector reform;average travel time;road user cost;annual traffic growth;vehicles per day;number of accidents;road corridor;borrower performance;project costing;penalty system;maritime administration;outcome targets;road condition;contract management;road work;routine maintenance;contract maintenance;technical expertise;Government Performance;line item;institutional strengthening;causal chain;traffic level;transport cost;intermediate indicator;maritime sector;safeguard policy;black spot;entry rate;expenditure increase;primarily use;local contractor;project indicator;annual budget;land acquisition;performance agreement;social safeguard;environmental regulation;Environmental Assessment;journey time;quality rating;environmental safeguard;Safeguard Policies;transport management;infrastructure service;operational inefficiency;legal institution;construction cost;poverty incidence;secondary legislation;demonstration effect;dollar term;procurement practice;take time;construction industry;learning process;remedial measure;road investment;institutional outcome;fiduciary assessment;highway engineering;transitional period;road roughness;causal link;measuring equipment;results framework;title holders;sustainable management;financing system;market economy;strategic objective;procurement arrangement;european commission;asset inventory;primary focus;local beneficiary;insufficient information;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.