Detalhes
-
Autor
-
Data do documento
2021/10/26
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR48144
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/10/26
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Dasu Hydropower Stage I Project - P121507 - Sequence No : 14
-
Palavras-chave
Social and Environmental Management Plan; Water and Power Development Authority; Hydropower; transmission line; Environmental and Social Safeguard; power generation facility; loss of life; cost generation; code of conduct; Investment Project Financing; preparatory work; guarantee fee; payment guarantee; future hydropower; local area; village committee; access road; health facility; social issue; consultative meeting; river diversion; land acquisition; affected persons; local resident; condition precedent; operation risk; risk category; local development; solar light; large hydropower; result indicator; power line; hydraulic structure; upfront fee; private capital; water resource; high reward; hydropower plant; construction supervision; public water; loan guarantee
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.