Skip to Main Navigation

Afghanistan - Rural Access Project : environmental assessment (Inglês)

The Afghanistan Rural Access Project will scale up the activities supported under National Emergency Rural Access Program (NERAP) and will assist the client in secondary and tertiary road rehabilitation. Negative measures include: soil erosion, waste management, water pollution, air pollution, dust, loss of natural habitat, and ecology. Mitigation measures include: a) reuse of cut material in hill roads; b) protection of embankment slopes in case of alignment on embankments; c) conduct of hydrological investigations during project preparation; d) protection of land on hill side from stability loss due to cutting; e) protection of lands on valley side from debris due to construction; and f) scheduling construction activities as per water availability.

Detalhes

  • Data do documento

    2012/03/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E3018

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Afeganistão,

  • Região

    Sul da Ásia,

  • Data de divulgação

    2012/04/12

  • Disclosure Status

    Disclosed

  • Nome do documento

    Afghanistan - Rural Access Project : environmental assessment

  • Palavras-chave

    compensation criterion;degradation of critical natural habitats;Environmental and Social Impact Assessment;Institutional Strengthening and Capacity Building;Environmental and Social Management Plan;resettlement action plan;worker health;safe disposal of wastes;grievance redress mechanism;adverse social impact;community consultation;social and environmental;loss of livelihood;approach to mitigation;natural water bodies;flood prone area;rural road network;machinery and equipment;rural access infrastructure;natural water courses;rehabilitation of water;repair and reconstruction;risk of damage;works of art;payment of compensation;case of acquisition;informal settlement;customary right;local government agency;surface water body;rural road rehabilitation;severity of impact;acquisition of land;construction and operation;water scarce area;project road;construction of bridges;tertiary road network;grievance redressal;resettlement and rehabilitation;law and regulation;reconstruction and rehabilitation;significant adverse impact;cultural heritage site;codes of practice;project completion date;decentralization of management;physical cultural resources;conditions of transfer;rehabilitation of road;land acquisition;secondary road;social issue;cultural artifact;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.