Detalhes
-
Autor
-
Data do documento
2020/06/25
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR41206
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/06/25
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - AFR RI-3A Tanzania-Zambia Transmission Interconnector - P163752 - Sequence No : 04
-
Palavras-chave
regional power trade; electric supply company; preparation of bidding documents; power transmission capacity; Investment Project Financing; Power Market; finance and planning; number of women; transmission infrastructure; transmission line; power pool; cross-border infrastructure; procurement process; construction activities; mentor program; market design; trading platform; operation risk; risk category; operational requirement; market rule; kv line; response time; regional interconnection
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.