Detalhes
-
Data do documento
1994/11/10
-
TIpo de documento
Relatório de Conclusão do Projeto.
-
No. do relatório
13700
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Zambia - Industrial Forestry Project
-
Palavras-chave
Economic Rate of Retum;suspension of disbursement;development of forest;short term consultant;quality and quantity;area of plantation;external debt service;repair and maintenance;foreign exchange income;power and water;waste disposal system;minor repair work;shortage of funds;human resource capacity;provision of power;risk of contamination;reduction in forest;availability of data;public holding company;procurement of equipment;forest management plan;public corporation;forest plantation;fire protection;commercial basis;pine plantations;silvicultural management;long-term training;plantation forest;wood processing;financial difficulties;wood product;wood production;external training;waste handling;civil works;cost center;worker training;fire fight;management development;treatment plant;project's impact;consulting service;Consulting services;borrower performance;managerial capability;net effect;development work;fire loss;logging operations;capital injection;administrative support;managerial deficiency;remedial action;personnel management;account audit;privatization program;efficient management;pulp mill;domestic supply;fire hazard;plantation resource;financial statement;forestry activities;commercial experience;bank finance;wood technology;road condition;local costs;road maintenance;structural adjustment;transfer technology;wood harvest;forestry development;research plan;internal resources;project execution;logging road;transport volume;peak production;production drop;financial resource;timber price;ministerial department;business travel;preparatory work;management problems;conserve soil;market potential;forest land;accessible forests;domestic demand;increased imports;exotic species;paper product;short-term training;government control;privatization schedule;manufactured products;future use;middle management;reference point;eucalypt species;appraisal mission;improve forest;forest road;engineering design;plantation estate;equity contribution;credit closing;project sustainability;public company;special care;Bank Fund;timber processing;previous work;administrative staff;processing operation;operational level;store management;beneficial impact;zambian kwacha;construction services;water supplies;management skill;commercial bank;radio workshop;production management;cost centre;institutional design;mobile workshop;plant seed;counterpart fund;resolving problem;regular staff;access road;transport equipment;routine maintenance;performance result;statistical information;production capabilities;fire control;management capability;bus transport;hand weeding;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.