Skip to Main Navigation

Kingdom of Eswatini - Water Supply and Sanitation Access Project (Vol. 10) : Swaziland Water Services Corporation SHEms Policy Manual (Inglês)

The objective of the Water Supply and Sanitation Access Project is to increase access to improved water supply and sanitation services in targeted areas of Eswatini. Some of the negative impacts and mitigation measures include: air monitoring will be conducted periodically to assess the air emissions level at the treatment plant; it will be ensured that construction meets applicable standards and industry practices such as conducting regular inspection and maintenance; implementing a leak detection and repair program (including records of past leaks and unaccounted-for water to identify potential problem areas) and replacing mains with a history of leaks of with a greater potential for leaks because of their location, pressure stresses, and other risk factors; the flush water will be discharged into a separate storm sewer system with storm water management measures such as a detention pond, where solids can settle, and residual chlorine consumed before the water is discharged; erosion during flushing will be minimized by avoiding discharge areas that are susceptible to erosion and spreading the flow to reduce flow velocities; oil swabs, spent ad expired chemicals and other hazardous waste will be placed in separate, marked bins and will be stored in containers for environmentally sound disposal in accordance with the Waste Regulations, 2000; and disposing of waste will be done appropriately and on a regular basis in an approved Waste disposal site.

Detalhes

  • Data do documento

    2017/11/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    139773

  • Nº do volume

    10

  • Total Volume(s)

    11 (Ver todos os volumes)

  • País

    Eswatini,

  • Região

    África,

  • Data de divulgação

    2019/07/25

  • Disclosure Status

    Disclosed

  • Nome do documento

    Swaziland Water Services Corporation SHEms Policy Manual

  • Palavras-chave

    Effective Date; Occupational health and safety; waste water treatment plant; integrated environmental management; iso 14001; standard operating procedure; water treatment process; drinking water guidelines; total suspended solid; emergency response plan; national climate change; strategic decision making; climate change impact; point of use; legislation and regulation; effective communications channels; environmental management system; hydraulics engineer; method of performance; risk assessment process; loss of integrity; amount of water; severity of impact; improvements in water; capital expenditure budget; water quality standard; complaint management system; results of action; availability of resource; management review; treated water; business process; preventive action; stakeholder analysis; potable water; environmental aspect; corrective action; emergency situation; call centre; Waste Management; emergency preparedness; occupational injury; raw water; Occupational Injuries; quality water; water loss; sound management; work environment; project engineer; dissolved solid; Management Systems; electronic system; communication process; chlorine plant; procurement process; electrical safety; commercial service; escherichia coli; consumer meter; water level; responsible person; internal resources; external provider; meter maintenance; regulatory requirement; energy resource; iso standard; security service; documentation requirement; geographic factors; external factor; electrical conductivity; External Finance; loan fund; industrial relation; government institution; routine maintenance; process flows; efficient equipment; water quantity; management responsibility; hardness water; chemical mixing; legal requirement; competent person; care service; evaluation process; job profile; wastewater service; legal compliance; legal expertise; applicable legislation; process use; safe environment; adaptation activities; mission statement; water catchment; water resource; health records; health implications; health monitoring; production process; measurement requirement; public affair; property damage; environmental incidents; environment management; audit result; conducting investigation; public health; public concern; policy procedure; operational procedure; financial resource; environmental pollution; audit finding; audit process; disposal service; audit criterion; internal audits; commercial management; legal registers; internal communication; risk control; security credentials; intake work; document control; software version; quality objective; external stakeholder; filtration process; process change; performance gap; environmental compliance; waterborne disease; chlorine gas; measurement results; finance manager; fire systems; community impact; response capability; emergency service; operational compliance; waste collection; environmental degradation; disposal method; task instruction; risk analysis; administrative control

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.