The development objective of the Metro Manila Wastewater Management Project for Philippines is to improve wastewater services in Metro Manila. The Valenzuela STP and Conveyance System Project under MWMP seek to improve the water quality of the three (3) water bodies in Valenzuela namely, the Tullahan, Meycauayan and Polo River. Some of the negative impacts and mitigation measures are includes : (i) excavation and other construction activities may occupy portions of the road that may lead to temporary road closure and traffic congestion; (ii) adequate barricades and warning signs shall be placed visibly to vehicles and pedestrians; (iii) any damage to property will be replaced or recompensed by the Contractor at fair replacement cost; (iv) delivery of excavation materials will be done, as much as possible, during night time to prevent aggravating the existing traffic conditions in the area; (v) high noise levels may be experienced in residential houses near the roadsides due to passage of vehicles and heavy equipment going to the construction site; (vi) disturbance can be minimized by observing proper operational schedule for equipment emitting noise; (vii) civil works and operations will entail digging and excavation of the soil that may cause dust pollutions in the air.
Detalhes
-
Data do documento
2020/04/13
-
TIpo de documento
Plano de reassentamento
-
No. do relatório
SFG3893
-
Nº do volume
2
-
Total Volume(s)
5
-
País
-
Região
-
Data de divulgação
2018/05/14
-
Disclosure Status
Disclosed
-
Nome do documento
Land and Right of Way Acquisition Report for North and South Pasig Sewerage System
-
Palavras-chave
sewer network; pipe diameter; pipe laying; pump station; sewerage system
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.