The Environmental Mitigation Plan for the Road Safety Project for Vietnam proposes to include requirements in bid and contract documents to mitigate impacts in the following five areas: Materials supply (indirect impacts); soils; hydrology; air quality; and noise. Mitigations will specify using only existing authorized borrow pits, licensed quarries, and licensed hot-mix asphalt plants; appropriate air pollution control equipment; supervision to ensure minimal soil loss for agricultural production; limiting side slope angles; using less erode-able materials; lined-down drains to prevent erosion; stabilizing embankments; revegetation; trenching; seeding with rapid growing seed mix; installing adequately sized drainage channels; liaisoning with local land-use planning authorities; avoiding adverse water quality impacts through adequate supervision; watering for dust control; banning open burning; discontinuing construction under unfavorable conditions; using equipment to suppress noise; locating equipment away from sensitive areas; and site-specific time constraints. The report anticipates no significant adverse impacts to air quality during operations.

Detalhes

  • Autor

    Asia Development Assistance Facility, New Zealand Agency for International Development, Opus International Consultants, Transport Development and Strategy Institute

  • Data do documento

    2004/11/12

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    E1047

  • Nº do volume

    2

  • Total Volume(s)

    3

  • País

    Vietnã,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2004/11/12

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental management plan for engineering works

  • Palavras-chave

    monitoring agency;project design and implementation;environmental requirement;accident resulting;indirect impact;road safety education;response to accident;adverse environmental impact;component of phase;road user education;road safety audit;monitoring plan;Emergency Medical Services;water quality testing;local environmental agency;negative environmental impact;volume of traffic;biochemical oxygen demand;environmental specialist;mitigation measure;environmental aspect;mitigation cost;preventive measure;national traffic;construction period;rumble strip;environmental training;Traffic Signals;environmental compliance;Traffic Accident;moving vehicle;local traffic;access road;environmental consultant;horizontal curve;monetary term;Traffic Safety;environmental condition;emergency service;adverse consequence;awareness campaign;engineering design;environmental parameters;informal training;school location;environmental mitigation;public consultation;field work;secondary road;environmental consideration;smaller one;road intersection;school access;monitoring cost;compensatory measure;lane marking;environmental cost;project costing;budget provision;environmental monitoring;noise measurement;primary purpose;traffic speed;Environmental Assessment;enforceable contract;site survey;traffic lane;road environment;road marking;construction phase;walk speed;cross traffic;environmental assistance;dissolved oxygen;standard requirement;market activity;warning signs;environmental supervision;suitable candidate;main road;job description;contract provision;monitor compliance;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.