Skip to Main Navigation

Mozambique - Emergency Resilient Recovery Project : additional financing (Inglês)

The development objective of the Emergency Resilient Recovery Project for Mozambique is to restore the functionality of critical infrastructure in a resilient manner in the disaster-affected provinces; and to improve the Government of Mozambique's capacity to respond promptly and effectively to an eligible crisis or emergency. The proposed Additional Financing (AF) would provide support to the Government of Mozambique (GoM) in its emergency response to the 2015-2016 drought, caused by the El Niño-Southern Oscillation (ENSO) phenomenon. The proposed project will maintain a multi-sectoral approach to resilient and sustainable recovery, building on the ERRP components. It is designed to meet the immediate food security needs of the drought affected population, as well as the critical needs for drought mitigation identified for the water sector, while safeguarding the financial resources of the parent project dedicated to building the resilience of critical infrastructures to flooding. The expected outcomes are: (i) a scale up of the resilient water management and water supply infrastructure to mitigate drought impact (US$16.5 million); and (ii) improved resilience of drought-affected communities through food security emergency interventionsand associated implementation costs (US$3.5 million) as part of the Government's Strategic Response Plan for Drought Emergency to support over 1.5 million people from December 2016 to March 2017. The AF will increase the geographical scope of the original project by extending the activities to the Southern Region.

Detalhes

  • Data do documento

    2016/12/30

  • TIpo de documento

    Documento do projeto

  • No. do relatório

    PAD2115

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Moçambique,

  • Região

    África,

  • Data de divulgação

    2017/01/06

  • Disclosure Status

    Disclosed

  • Disclosure Type

    Simultaneous Disclosure

  • Board Meeting Date

    2017-01-13T00:00:00Z

  • Nome do documento

    Mozambique - Emergency Resilient Recovery Project : additional financing

  • Palavras-chave

    Global Facility for Disaster Reduction and Recovery;Environmental and Social Impact Assessment;Environmental and Social Management Framework;Environmental and Social Management Plan;access to safe drinking water;source income;public water supply system;people in urban area;economic and financial analysis;fund expenditure;Investment Project Financing;Internal rate of return;alternative sources of water;number of beneficiaries;drought mitigation;quantity of water;negative environmental impact;water supply infrastructure;capacity for implementation;water distribution system;food insecure people;water quality parameter;food security situation;reallocation of fund;grievance redress mechanism;emergency response plan;access to water;agriculture and livestock;social safeguard policy;distribution of food;urban drinking water;Grievance Redress Service;impact of climate;social and environmental;rural water supply;public sector financing;water supply intervention;drinking water supply;water control structure;core sector indicator;negative social impacts;drinking water services;water treatment plant;quality of water;access to information;source of financing;extremely poor people;children with access;food assistance;food insecurity;critical infrastructure;affected population;central regions;resilient infrastructure;water system;drought recovery;fresh water;financial resource;agricultural productivity;emergency intervention;drought response;positive impact;human consumption;drought emergency;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.